How to choose the first workflow to automate

Choose a task that happens often, follows stable rules, has few exceptions, connects to systems you can reach, and fails in a way you can catch and fix. That is often not your most time-consuming task. The tasks that eat the most hours tend to eat them for a reason: they take judgment, and they are full of exceptions.

Your first project should also do more than save hours. It should prove you can reach your data, give someone ownership of a running automation, and earn your staff’s trust. A public failure on the first try makes the second one harder to fund.

Written for Owners and operations leaders with several manual processes and budget for one.

The short answer

  • Score each candidate with the people who do the work.
  • Hours alone don’t make a good first project.
  • Score what happens if the automation is wrong.
  • Let a score of 1 on the riskiest criteria stop the project.
  • Automate a small slice of the big task instead.

Why can the biggest time sink be a poor first project?

Look at why the task takes so long.

Often, the routine part is quick and the hours go to the hard cases: chasing a missing detail, or deciding what to do about a customer who doesn’t fit. Automate the routine part and you remove the easy minutes. The hard cases remain, and they now arrive with less context, because nobody has been following the case from the start.

There’s a second cost. If the system handles ordinary quotes for a year, a new estimator never learns on the easy ones. The hard cases then go to someone with less practice.

The automation scoring worksheet

Score each workflow from 1 to 5 on the seven criteria. For every criterion, a higher score means a better first project.

Have the people who do the work score it with you, because they see exceptions a manager may not.

What each score means
CriterionThe question1 means3 means5 means
FrequencyHow often does it happen?Monthly or lessWeeklyMany times a day
EffortHow many staff hours a week?Under 13 to 820 or more
Error costWhat do today’s mistakes cost?LittleAnnoying reworkLost money or customers
Rule stabilityDo the rules stay the same?Change often, or nobody has written them downChange yearlyRarely change
Exception rateHow many cases fall outside the rules?MostAbout 1 in 5Almost none
Integration accessCan software reach the data?Paper, or in someone’s headFile exportsDocumented API
Consequences of failureIf the automation is wrong, what happens?Serious, hard to undo, or unseenCostly, but fixableQuickly caught and easily fixed

A documented API, a published way for other programs to reach the software’s data, scores highest because nobody has to export files by hand.

Error cost and consequences of failure sound alike but point in different directions. Error cost measures the mistakes people make today, and high costs make automation more valuable. Consequences of failure measure what happens when the automation itself gets it wrong. A wrong automated action can repeat hundreds of times before anyone looks.

The anchors are ours and the scoring is rough. Use it to start an argument between people who know the work. A two-point difference in the total means little.

Three workflows, scored

Hypothetical example: a building-supply wholesaler, with made-up numbers.

  • A. Quoting custom jobs. Estimators spend 30 hours a week building quotes, several times a day. Pricing depends on the job, the customer and what the estimator knows about current supplier costs.
  • B. Copying web orders into accounting. About 40 orders a day at 2 minutes each, or roughly 6.7 hours a week. Both systems have documented APIs.
  • C. Monthly sales commission statements. About 8 hours a month. The data exports to a file, and the commission plan changes each year.
The biggest time sink scores 18 of 35, and the smaller task scores 28 (hypothetical example)
CriterionA. QuotingB. Web ordersC. Commissions
Frequency451
Effort532
Error cost434
Rule stability1Stop rule42
Exception rate1Stop rule43
Integration access253
Consequences of failure1Stop rule42
Total (out of 35)182817

Quoting takes more than four times the hours of web orders, and it’s the one a business would naturally want to fix. It also scores the lowest possible on three criteria. A wrong quote can commit you to a price, and nobody has written the rules down.

Web orders are less exciting and save fewer hours. They are the better first project. A failed order can be held for someone to fix the same day, and the rules are simple enough to test. Before you commit, run the numbers in our manual work calculator. Saving about 6.7 hours a week may not pay for a custom build, and a simpler connection between the two systems may be all you need.

Commissions can wait. The task runs once a month, the plan keeps changing, and mistakes land on people’s pay.

Stop rules: when does a high total not matter?

A good total can hide one bad score. Before you trust the total, apply these rules.

  • If rule stability scores 1, write the rules down and use them by hand first. You can’t automate what your team can’t state.
  • If exception rate scores 1, automate only the routine part, and send everything else straight to a person.
  • If consequences of failure scores 1, keep a person approving each result until the automation has earned trust.

These apply to workflow A three times over, and that tells you what to do with it.

What should you do with the big task?

You can still work on it, one small piece at a time.

For quoting, the first step needs no software at all: have the senior estimator write down the pricing rules. That alone may expose disagreements. Next, automate pulling the customer’s history and current supplier costs into a draft. The estimator still decides the price and sends the quote. Later, standard jobs might get a suggested price that a person checks.

Each slice can be scored on its own. “Pull supplier costs into a draft” would score far better than “automate quoting,” because a person still catches mistakes. Our article on the cost of manual work sets out five ways to remove the work, starting with fixing the process, which is often the right move for a task like this one.

Tradeoffs remain. Choosing the safe project means the biggest cost stays in place for now, and staff may wonder why you didn’t tackle the task everyone complains about. Tell them the plan. There’s one case where we’d start with the big task anyway: when it threatens the business, such as an error-prone process that could cost you a major customer or breach a rule. Then accept the risk, keep people approving the results, and budget for a serious project from the start.

Your blank worksheet

Copy this, list up to five workflows, and score them with the people who do the work.

Blank automation scoring worksheet
CriterionWorkflow 1Workflow 2Workflow 3
Frequency
Effort
Error cost
Rule stability
Exception rate
Integration access
Consequences of failure
Total
Any stop rules triggered?
Who owns it after launch?

If the last row is blank, you aren’t ready, whatever the score says. Automations need someone to notice when they stop. The next step is to write the winner up as a project brief.

When to get help

An engineer is useful once you have a shortlist, particularly to check integration access, because that score is hard to judge from the outside. Yippify builds internal tools and integrations when they’re the right answer. We’ll also tell you when a process change or a feature in your current software would do the job.

Have a shortlist of tasks you’d like to automate?

Tell us which ones, how often they happen and which systems they touch. We’ll tell you which we’d start with, and why.

  • Which task to start with
  • Whether the systems connect
  • When a simpler fix would do
Compare my shortlist

A rough description is enough to start. No specification needed.

Try the interactive FedPath bid review

FedPath bid review

Walk through an example of how FedPath, a product Yippify built, helps a business decide whether to bid.

Business owner

Should we bid on this facilities contract?

The business owner wants to check a Navy notice against the company’s capabilities before spending time on a bid.

Opportunity
Navy facilities contract
Question
Is the company eligible to bid?