How to turn a business workflow into a software project brief
Describe the work, and leave the software to the developers. A good brief covers how the work runs today, who does it, what goes wrong, what should change, and how you’ll know it did. It fits on two pages. Spend most of your effort on the exceptions, because that’s where estimates go wrong and projects run over.
You don’t need technical language. Developers can suggest the technology. They can’t guess that your service manager approves goodwill credits by replying to an email.
Written for Owners and operations managers who know the work and need developers to understand it.
The short answer
- Watch the work before you write about it.
- Ask about the last time it went wrong.
- Keep it to two pages, with open questions.
- Set first-version boundaries and today’s numbers.
- Trace one exception through to a test.
How do you collect what goes in the brief?
Don’t write it from a desk. Sit with the person doing the work and watch a few real cases.
Then ask for the odd ones: “What happened the last time this went wrong?” and “What do you do that nobody told you to do?” Pull the last ten unusual cases from email or the spreadsheet. People describe the normal path from memory. They forget the exceptions until one is in front of them.
This assumes you’ve already written down the problem and the people and decided that building is the right answer.
The project brief template
Copy this and fill it in. Short answers are fine, and “we don’t know yet” is a useful answer.
PROJECT BRIEF
Our business: What we do, in two sentences.
The problem: What is slow, wrong or risky today, and what it costs.
Current workflow: The steps today. Who does each one, in what tool.
Users: Each kind of person who will use it, how often, on what device.
Exceptions: The cases that don’t follow the normal path, how they’re
handled today, and how often they happen.
Desired outcome: What should be true when this works. No features here.
Constraints: Budget range, dates that can’t move, legal or data rules,
anything that must not change.
Integrations: Other systems it must read from or write to, who owns them,
and whether anyone has checked that a connection is possible.
First version
In: The smallest set that delivers the outcome.
Later: Good ideas that can wait.
Not doing: What this will never do.
Success measures: The number today, and the number we want.
Open questions: What we don’t know yet, and who might know.A completed project brief example
Hypothetical example. The company and all figures are made up.
Our business: We distribute parts for commercial kitchen equipment to repair companies. We have about 40 staff.
The problem: Warranty claims arrive by email and live in a shared spreadsheet. Claims get lost, customers call to ask where they stand, and we’ve credited some claims twice.
Current workflow:
- The customer emails the claim to our claims inbox.
- The claims coordinator adds a row to the spreadsheet and looks up the sale in accounting.
- If the part is under warranty, the coordinator asks the warehouse to inspect the return.
- The coordinator issues a credit in accounting and emails the customer.
Users: Two claims coordinators, all day at a desk. Three warehouse staff, a few times a day on a shared tablet. Two service managers, occasionally, often by phone. The bookkeeper, weekly.
Exceptions:
- Part is out of warranty, and we may still give a goodwill credit (about 10 a month).
- Part arrives without a claim, or a claim arrives without a part.
- Sale can’t be found, because older invoices don’t always list a serial number.
- One claim covers several parts, and some pass inspection while others fail.
Desired outcome: Every claim has one status anyone here can see. No credit goes out without the right approval and without passing inspection.
Constraints: We keep our accounting system. First version live before our busy season in October. Budget range to be discussed once we’ve seen the scope. Credit records must be kept for our accountant.
Integrations: Read sales from accounting and create credits there. We have not yet confirmed that our accounting plan allows this. Email for notifications.
First version:
- In: claim intake form, status tracking, warehouse inspection on tablet, manager approval, credit created in accounting.
- Later: customer portal, reports by manufacturer, reclaiming costs from manufacturers.
- Not doing: replacing accounting or inventory.
Success measures:
| Measure | Today | Target |
|---|---|---|
| Average days from claim to decision | 9 (from a sample of 30 claims) | 3 |
| Claims lost or duplicated each month | 4 | 0 |
| Coordinator hours a week chasing status | 6 | 1 |
Open questions: Can accounting accept credits from another system? What should happen when no sale date can be found?
Record today’s numbers before the project starts. If you need to put a dollar figure on the hours, use the method in our manual work article.
How does one exception become a requirement and a test?
Take the first exception in the example. One is enough to practice on.
- Today
A part sold 14 months ago has a 12-month warranty. The coordinator emails a service manager to ask for a goodwill credit. The manager replies, sometimes days later. The coordinator then issues the credit. Nothing connects the reply to the credit.
- The rule, once someone asks
A service manager may approve out-of-warranty credits up to $500. Above that, the owner also approves.
- Requirement
A claim made after the warranty ended is marked “Out of warranty.” No credit can be issued until the right person approves. The system records who approved, when and why.
- Test
Given a part with a 12-month warranty sold 14 months ago, when the coordinator submits a $320 claim, then the status is “Needs manager approval,” the credit can’t be issued, and a service manager is notified.
The test uses a format called Given-When-Then: the starting situation, the action, and the expected result. You don’t need the format. You do need that level of detail.
Look at what the trace did. Before it, this was “sometimes we give goodwill credits.” After it, a developer can see a new status, an approval step, two permission levels and a record to keep. Someone can estimate that. Left out, it would surface during testing or after launch, as a change request or an argument.
The trace also finds questions nobody has asked. A claim on the last day of the warranty: in or out? What if the coordinator is also a manager? What if older invoices have no serial number, so we can’t find the sale date at all? That last one stays on the open questions list. It’s a business decision, and it’s better made now than by a developer guessing. Each answer becomes another test for your acceptance checklist.
What should you leave out?
Skip screen designs unless they show something specific, because they pull the conversation toward buttons before the rules are clear. Skip technology choices unless you have a real constraint, such as a system you must stay on.
Don’t try to cover everything. Requirements change once people see working software, and that’s healthy. A 40-page specification written up front can give a false sense of certainty and be out of date by the time it’s read. Two honest pages with open questions will get you better answers, and a focused first version will teach you the rest.
Budget is the section people resist. Some guides advise leaving it out until you’ve talked to developers. We’d give a range if you can. A vendor who knows you’re thinking of a small first version will propose a different project than one who has to guess, and you’ll be able to compare the proposals more easily.
When to get help
If you can’t get the exceptions out of people’s heads, or the brief keeps growing, an outside engineer can help you run those conversations and size the first version. Yippify starts custom software projects this way, by mapping how the work happens today. Sometimes that shows a process change or an existing product would do, and we’ll say so.
Have a draft brief, or just a workflow that hurts?
Send what you have, rough is fine. We’ll tell you which exceptions matter most and what’s missing before you ask for quotes.
- Which exceptions matter most
- What’s missing from the brief
- A sensible first version
A rough description is enough to start. No specification needed.
Try the interactive FedPath bid review
FedPath bid review
Walk through an example of how FedPath, a product Yippify built, helps a business decide whether to bid.
Business owner
Should we bid on this facilities contract?
The business owner wants to check a Navy notice against the company’s capabilities before spending time on a bid.
- Opportunity
- Navy facilities contract
- Question
- Is the company eligible to bid?