How to move business data into a new system

Move the data in rehearsals, and prove each rehearsal worked by comparing old and new in four ways: counts, totals, relationships and representative records. Name one business owner for each type of data, who signs off the results. Keep a tested way back until the new system has earned trust.

Moving data is called data migration. Copying is usually the easy part. The bigger risk is data that looks fine but means something slightly different in the new system, so nobody notices until an invoice goes out wrong.

Written for Owners and operations leaders whose business records have to survive a system change.

The short answer

  • Rehearse the move in a test copy, more than once.
  • Compare counts, totals, relationships and real records.
  • Explain every difference in the money.
  • Name an owner for each type of data.
  • Decide how you’d go back before you switch.

How do you prove the migration worked?

Use all four checks. Each one catches what the others miss.

Hypothetical example. A parts distributor is moving from an old order system to a new one. All figures below are made up.

Four ways to prove a migration worked: the counts can match while the money doesn’t (hypothetical example)
  1. CountsDid everything arrive?

    1,926 of 1,926 invoices

    Match
  2. TotalsDoes the money agree?

    Open balance is off by $411.25

    Problem found
  3. RelationshipsAre records still connected?

    Every order points to a real customer

    Check each rehearsal
  4. Representative recordsDoes it look right to someone who knows?

    Odd records compared side by side

    Check each rehearsal

1. Counts: did everything arrive?

Compare the number of records of each type. Write down the expected number before you import, and explain any planned difference.

Record counts in the hypothetical migration
RecordsOld systemPlanned changeExpectedNew systemResult
Customers8,41237 duplicates merged8,3758,375Match
Orders61,204None61,20461,204Match
Open invoices1,926None1,9261,926Match

2. Totals: does the money agree?

Every count matches, but the data can still be wrong. Add up the numbers the business depends on, such as open balances, inventory on hand or hours worked.

Control total in the hypothetical migration
Control totalOld systemNew systemDifference
Open invoice balance$1,284,316.42$1,283,905.17$411.25

All 1,926 invoices arrived, yet the balance is off. Someone traces it to three invoices with partial credits. Those credits were kept in a notes column, and the import ignored that column. A count would never show this.

Don’t settle for “close enough.” A percentage threshold sounds reasonable, but a small percentage of a large balance can be real money on a real customer’s account. For money, every difference should be explained and signed off by the person who owns that data.

3. Relationships: are records still connected?

Records point to each other. An order belongs to a customer, and an invoice has lines. A migration can move every record and still break those links. A record that has lost its link is called an orphan.

Ask for these checks to be run on each rehearsal:

  • Every order points to a customer that exists. Orphans should be zero.
  • The lines on each invoice add up to the invoice total.
  • Each customer has the same number of contacts and orders as before, allowing for merged duplicates.
  • Merged customers kept the history of both original records.

4. Representative records: does it look right to someone who knows?

Have the people who know the data open records in the new system and compare them side by side with the old one. Pick them on purpose, because random picks tend to be ordinary. Include:

  • The oldest record and the newest one
  • The largest customer balance
  • A customer you merged
  • A closed account and one on credit hold
  • Names with apostrophes or accents
  • Part numbers or ZIP codes with leading zeros
  • Anything your staff calls “that weird one”

Start with a couple dozen and add more wherever problems appear. Leading zeros are a classic loss when data has passed through a spreadsheet. Microsoft’s Excel documentation says Excel removes them from entries like 00123, and that it keeps only 15 significant digits, so longer ID numbers get changed.

Tools can help with some of this. AWS Database Migration Service, for example, can compare source and target rows and report mismatches. That checks whether the rows match. A person still has to decide whether the result is right for the business.

The data migration checklist

Give each line one named owner. Vendors can do much of the technical work, but only your business can say what the data means.

Data migration checklist
StepWhat to doOwnerDone when
InventoryList every place the data lives, including spreadsheets and inboxesOperations leadNobody can name another source
Decide what movesChoose what to bring, archive or leave. Recent data may be enoughSystem ownerThe list is signed, and old data has a home
Field mappingMatch each old field to a new one, with rulesData owner and developerEvery field has a destination or a reason to drop it
CleanupFix errors, merge duplicates, decide what blanks meanData ownerCleanup rules are written down
Trial importsImport a small sample, then everything, into a test copyDeveloperThe import runs start to finish without manual fixes
ReconciliationRun the four checks and explain every differenceData ownerDifferences are explained and signed off
RehearsalRun the whole cutover, timed, with the real teamCutover leadIt fits your available time, more than once
Go or no-goDecide using criteria written in advanceSystem ownerDecision is recorded
CutoverStop changes in the old system, do the final import, check, openCutover leadThe four checks pass on live data
RollbackKeep a tested way back, and a plan for new entriesCutover leadThe team has practiced it
After go-liveKeep the old system read-only for lookups. Recheck totals at first month-endData ownerFinance and operations confirm

A data owner is the person whose job depends on that data being right, such as a finance lead for invoices. Cutover is the moment you switch from the old system to the new one. Rollback means going back to the old system if the switch fails.

What does field mapping look like?

Field mapping means deciding where each piece of old information goes in the new system.

Part of a hypothetical field map
Old fieldNew fieldRuleOpen question
CUST_NMCustomer nameCopy, trim extra spacesNone
STATUS (A, H, X)StatusA = Active, H = On hold, X = Closed. Stop the import on any other valueStaff say “Z” was used once. What did it mean?
PHONEPhoneStandardize the format, keep the original tooNone
NOTESNotesCopy as isSome notes hold credits, so those need their own field

The last column is where the real work is. Those answers usually live in someone’s head.

Cutover and rollback: what should you decide first?

Microsoft’s cutover guidance for Dynamics 365 is written for its own product, but it applies widely. It lists an owner and backup owner for each task, verification and sign-off steps, and a rollback plan. It also recommends rehearsing with the same data, tools and people, and avoiding dates when you close your books. Its Business Central guidance suggests at least two dry runs.

The hard part of rollback comes after people start working. Once someone enters a new order in the new system, going back means deciding what happens to that order. Before cutover, set the point after which you fix forward instead of going back, and how you would carry over any new entries.

You also have to choose how to switch. A single cutover is simpler to understand, but it puts everything at risk at once and may need the business to pause. Moving in stages, such as one branch or one type of record at a time, is safer, but you run two systems for longer and the data has to stay in step between them. Before Yippify, our engineering leadership moved a group of publishing sites to a modern stack on AWS and a communications platform from its own data center to the cloud, both in stages with the business running. Stages cost more in coordination, and we’d still accept that for most systems the business can’t afford to stop.

What if your data is a mess?

Most real data is. You don’t have to fix all of it. Move what you need, and clean what will affect money, customers or legal records. Leave the rest in an archive you can search. If years of history drive the cost, ask whether anyone will open it, or whether read-only access would do. Our guide to outgrowing Excel covers the spreadsheet starting point.

Once the data is in, test real work on it. Our acceptance testing checklist covers that step.

When to get help

An engineer earns their cost when the old system has no documentation, when business rules are hidden in the data, or when mistakes would hit money or legal records. Data migration is part of our software modernization work: moving data in batches with automated reconciliation, and keeping a route back until the new path is proven.

Moving to a new system and worried about the data?

Tell us where the data lives today and where it needs to go. We’ll help you see what to check first and where the risk is.

  • What to check first
  • Where the risk is
  • How to keep a way back
Talk through the move

A rough description is enough to start. No specification needed.

Try the interactive FedPath bid review

FedPath bid review

Walk through an example of how FedPath, a product Yippify built, helps a business decide whether to bid.

Business owner

Should we bid on this facilities contract?

The business owner wants to check a Navy notice against the company’s capabilities before spending time on a bid.

Opportunity
Navy facilities contract
Question
Is the company eligible to bid?