The hidden cost of building software too quickly
When the date can’t move, cut features and keep the work a demo doesn’t show: tests, clear structure, security and notes for the next person. A rushed project keeps every feature and skips that work. The software looks finished, and the bill arrives later as slower changes, more bugs and each change costing more than the last.
Most owners wanted the software yesterday, and shipping something useful in weeks instead of months is often the right call. Below we show what rushing costs over time and how small releases keep a project fast.
Written for Owners, founders and public-sector managers paying for software, and anyone living with an application that gets harder to change every month.
The short answer
- If the date can’t move, cut features and keep the tests and security work.
- A rushed project keeps the full feature list and the date, and drops the work a demo doesn’t show: tests, structure, security and notes.
- Those skipped pieces become technical debt, and you pay it back in slower changes and more bugs.
- Small releases every week or two keep the cost of each change steady.
- Rushing is fine for something you will throw away, such as a demo or a one-off test of demand.
Fast and rushed are different
A fast project builds less. A rushed project tries to build everything by the same date.
When the whole list and the date both stay fixed, something has to give. What gets dropped is predictable: the automated tests, the second person reading each change, the setup notes, the access controls. None of them show up in a demo, so cutting them costs nothing visible until the first change after launch.
If the date really can’t move, the better trade is to cut features. Decide what the first release leaves out, and keep the tests and the security work.
What rushing costs over time
Technical debt is the cost of shortcuts. Each one saves a day now and costs more later.
Rushed software is cheaper to change at first. The skipped work catches up, and each change gets more expensive. Incremental development costs a little more at the start and stays steady. An illustration of a common pattern, not measured data.
| Stage | Rushed | Incremental |
|---|---|---|
| First release | Sooner, with more features | Soon, with fewer features |
| Each change after launch | Takes longer every month | Stays about the same size |
| Bugs | Found by customers | Mostly caught by tests |
| Security | Added after something goes wrong | Built in from the start |
| Two years later | Talk of a rewrite | Still growing |
The crossing point is where most owners first notice something is wrong. A change that took a day now takes a week. Fixing one bug causes another. Eventually someone suggests starting over, which is usually the most expensive option of all. Our article on whether to rewrite your application explains why, and what to do instead.
What technical debt means
A developer copies the same code into five places instead of writing it once. A quick fix gets stacked on another quick fix. Nobody writes down how the system works. Each of those shortcuts saves time this week.
The programmer Ward Cunningham came up with the name in 1992, comparing shortcuts in code to borrowing money. Some debt is smart, the way a business takes a loan for a truck that starts earning right away.
The trouble is debt nobody chose and nobody tracks. You pay the interest in slower changes, more bugs and developers who are afraid to touch parts of the code. We treat debt as a financing decision: take it on deliberately, write down what was skipped and why, and set aside some time in every cycle to pay it back.
What a rushed project skips
The first work to go is the work nobody sees in a demo.
Why testing matters
A test is a small program that checks whether part of your software still works. If your software works out sales tax, a test feeds it a known order and checks the answer. Good software has hundreds or thousands of these, and they run automatically, in minutes, every time a developer changes something.
Without tests, the only way to know a change didn’t break something is for a person to click through everything. Nobody has time for that, so it doesn’t happen, and customers find the bugs instead.
Maintainability: can the next person change it?
Maintainable software is easy for someone else to understand and change. That someone might be a new developer, or the same developer a year later who has forgotten the details.
The signs of maintainable software are plain: names that say what things are, the same problem solved the same way everywhere, short notes explaining the odd decisions, and a written guide to setting it up.
Security is the first thing a rushed project skips
Good security work is invisible, so it’s easy to put off. The usual shortcuts: everyone gets full admin access because setting up roles takes time, passwords and keys are saved inside the code, the building blocks the software uses never get updated, and nobody checks who can see whose data.
Each of those is cheap to get right at the start and expensive to fix after something goes wrong. Public agencies, and any business handling health, payment or personal information, usually have security requirements written into rules or contracts. Plan for them from the first week.
Small releases: the safer way to move fast
Release small pieces often, every week or two, instead of one big launch after months.
When only a little changed, a mistake is small and easy to find. You hear from real users early, while changing direction is still cheap. And you can stop at any point and still have something that works.
- Pick one piece
Small enough to finish in a week or two.
- Build it with tests
The tests ship with the feature, not later.
- Review
A second person reads every change before it goes live.
- Release
Ideally an automated step, not a late-night manual one.
- Watch and learn
Check how it’s used. That decides the next piece.
When rushing is the right call
Skipping tests and structure is a reasonable choice when the software is meant to be thrown away: a clickable demo for investors, a prototype to see whether anyone wants the product, a tool for one event. A startup with a few months of money left may cut corners on purpose to learn whether the idea works at all.
The cost arrives when the throwaway version becomes the product, because it worked and nobody planned the rebuild. If you rush, agree in writing which parts get rebuilt before real customers or real data depend on them.
Questions to ask your developer or vendor
Ask these before the deadline is set
- What will you leave out of the first release to hit the date?
- Do you write automated tests, and do they run on every change?
- How often will we get a working release we can try?
- Where are passwords and keys stored, and who has admin access?
- If you left tomorrow, could someone else take over? What’s written down?
- Which shortcuts are you taking, and when will we pay them back?
When to get help
If your software already shows the signs, such as slow changes, recurring bugs, or one person who is afraid to touch it, a short review is the cheapest next step. It tells you what is risky, what can wait and what to fix first.
Yippify reviews and modernizes existing applications in small steps, while they keep running. If the person who built yours has moved on, see what to do when the developer leaves.
Frequently asked questions
What is technical debt in simple terms?
Technical debt is the future cost of shortcuts taken while building software, such as skipped tests, copied code or missing documentation. Like a loan, it lets you move faster now, and you pay it back later with interest: slower changes, more bugs and more risk. Some debt is a sensible choice. Debt nobody chose or tracks is the expensive kind.
Is it ever OK to build software quickly?
Yes. Moving quickly by building less is often the right call. The trouble comes from building the same amount in less time, which forces the team to skip testing, security and documentation. When a deadline is fixed, cut features and keep the testing, security and documentation.
How can I tell if my software was rushed?
Common signs: small changes take weeks, fixing one bug causes another, nobody wants to touch certain parts, there are no automated tests, only one person can release changes, and security updates are far behind. Any one of these is worth a review. Several together usually mean significant technical debt.
Do automated tests make a project more expensive?
They add some time at the start. Over the life of the software they usually save more than they cost, because they catch mistakes in minutes instead of letting customers find them, and they let developers change the code without fear of breaking something.
Living with software that was built in a hurry?
Tell us what the software does and what happens when you try to change it. We’ll look at the code, the tests and the security, and tell you what to fix first and what can wait.
- A plain list of the real risks
- Fixes in small, safe steps
- No rewrite unless it truly pays
A rough description is enough to start. No specification needed.
Try the interactive FedPath bid review
FedPath bid review
Walk through an example of how FedPath, a product Yippify built, helps a business decide whether to bid.
Business owner
Should we bid on this facilities contract?
The business owner wants to check a Navy notice against the company’s capabilities before spending time on a bid.
- Opportunity
- Navy facilities contract
- Question
- Is the company eligible to bid?